HPC-AI Services

Ioan Campean

Horaţiu Răzvan Florea
Assistant Professors
About
The AIRi Factory has a state-of-the-art High Performance Computing infrastructure, designed with a focus on engineering quality and efficiency rather than sheer scale. It is hosted and operated by the Technical University of Cluj-Napoca.
A leading AI supercomputer for research in Romania
One of the most powerful AI computing systems in Romania focusing on research, currently delivers a peak performance of up to 144 petaflops of FP8 AI computing (dense) and 1.2 petaflops of FP64 performance for scientific computing. Once fully deployed, the system will reach about 576 petaflops of FP8 AI computing (dense) and about 4.8 petaflops of FP64. The AIRi Factory provides a ready-to-use scientific research environment for academic researchers, startups, small and medium-sized enterprises (SMEs) and industrial projects.
Technical overview
The GPU partition currently consists of four direct liquid-cooled HPE ProLiant Compute servers. Each has eight NVIDIA B200 GPUs, two 96-core AMD EPYC 9655 processors, 3 TB of DDR5 memory and 25.6 TB of local NVMe storage, and connects to the cluster via four NDR 400 Gb/s InfiniBand links (1.6 Tb/s per node). Together, these nodes provide 32 GPUs, 768 CPU cores and 12 TB of memory.
The compute nodes are connected over NDR InfiniBand to an all-flash Lustre parallel file system providing approximately 340 TB of usable high-performance shared storage.
Phased deployment
The four servers in operation are the first phase of a planned 16-node system by September 2027. In the next two phases, twelve more servers with the same configuration will be added to the GPU partition. When complete, the partition will have 16 nodes with a total of 128 NVIDIA B200 GPUs, 3,072 CPU cores, 48 TB of DDR5 memory and about 410 TB of local NVMe storage. All nodes will share the same high-speed NDR InfiniBand fabric and Lustre parallel file system.
- Phase 1: 4 servers - 15 November 2026 (supported by HRIA)
- Phase 2: 8 servers - 30 July 2027 (4 servers supported by IPCEI EURODRIVES)
- Phase 3: 16 servers - 30 September 2027 (8 servers supported by AI4INO)
- Phase 4: 32 servers - 30 September 2028
This infrastructure is dedicated to training AI models. In addition, three NVIDIA H200 servers will be dedicated to AI inference, enabling the deployment and execution of models developed within the AIRi Factory (operational from July 2027)

